Our portfolio is testimony to our dynamic approach, showcasing some of
the Island’s most significant landmarks.
Completed
PlantPrefabSteel
The New Embassy Compound
- Ta Qali
- 2008
2008
Ta Qali
The New Embassy Compound
In 2008, Vassallo Builders was awarded the main subcontract for the construction of the New Embassy Compound in Malta from American contractor AICI. The project, built on 40,000sqm of land, comprised the construction of a main building together with a number of smaller buildings across the site. Later, the company was also awarded another subcontract for a substantial part of the finishing works. Aside from the standard pressures that exist on large-scale projects, the unique challenge on this one came from the high specifications associated with such a high security, American building.
Completed
PlantPrefabSteel
Prince of Wales
- Sliema
- 2005
2005
Sliema
Prince of Wales
Officially inaugurated in 2005, Prince of Wales residential complex in Sliema marks a milestone in promoting an independent lifestyle support for senior citizens in Malta, once again proving that CareMalta is the market leader in the specialized sector of the care and elderly. The property which consists of 58 studio and 2 bedroom apartments, was built on a turnkey basis. Prince of Wales gives the opportunity to senior citizens to enjoy life to the full without the burden of home ownership, thanks to its innovative Seniors Lifestyle Plan.
Completed
PlantPrefabSteel
Radisson SAS Golden Sands Resort and Spa
- Ghajn Tuffieha
- 2005
2005
Ghajn Tuffieha
Radisson SAS Golden Sands Resort and Spa
On 14th October 2005, the new 5 star Radisson SAS Golden Sands Resort and Spa was officially inaugurated following the successful completion of construction works by Vassallo Builders Ltd. At the time the resort consisted of 337 rooms in three distinct blocks magnificently located on the edge of a cliff overlooking Golden Bay and a fourth multipurpose block housing restaurants ad reception halls leading to the sandy beach below.
Completed
PlantPrefabSteel
St. Angelo’s Mansions
- Kalkara
- 2003
2003
Kalkara
St. Angelo’s Mansions
In 2003, St , Angelo’s Mansions, an exclusive block of luxury apartments having sea views and forming part of the Cottonera Waterfront Project was inaugurated. The project included the construction of a 300 berth yacht marina, a marina residency club at Fort St Angelo, various retail outlets, offices, commercial and cultural complexes, catering establishments and car parking facilities.
Completed
PlantPrefabSteel
Malta Stock Exchange
- Valletta
- 2001
2001
Valletta
Malta Stock Exchange
In 2001, Vassallo Builders Limited completed the construction and finishing of the new Malta Stock Exchange premises at the former Garrison Church in Valletta. This turnkey project required that the complete internal development be carried out while retaining the existing historical edifice.
Completed
PlantPrefabSteel
Bank of Valletta Processing Centre
- Santa Venera
- 2001
2001
Santa Venera
Bank of Valletta Processing Centre
In November 2001, Vassallo Builders Limited, forming part of the RMV Joint Venture, were awarded the contract for the construction of the Bank of Valletta Processing Centre in St Venera. The site footprint was in excess of4000 square metres and consisted of 3 basement floors and two separate 4 and 3 storey blocks above.
Completed
PlantPrefabSteel
Radisson SAS Bay Point Hotel
- St Julians
- 1997
1997
St Julians
Radisson SAS Bay Point Hotel
In 1997, The Island Hotel Group embarked on the development of its 3rd hotel; the Radisson SAS Bay Point Resort. The land occupied was that of 10,000 square metres. The remaining 28,000 square metres of land were utilized for landscaping and preservation of two ecological zones measuring 5,000 square metres.
Completed
PlantPrefabSteel
Malta Freeport
- Birzebbuga
- 1994
1994
Birzebbuga
Malta Freeport
Back in 1994, N.O.V.I.T.A Construction Consortium Company Ltd. was awarded the contract for the construction of the Malta Freeport Terminal II. Vassallo Builders contributed in its execution throughout its association with N.O.V.I.T.A. The first phase of Terminal Two commenced operations in 1996, providing an additional quay length of 480 metres with a water depth of 15.5 metres. All the civil works were completed in 1998, ahead of schedule. Terminal two offers a total area of 210,000 square metres,4,040 container ground slots and is capable of handling three mother vessels, one feeder and a ro-ro vessel simultaneously.
Completed
PlantPrefabSteel
Casa Arkati
- Mosta
- 1993
1993
Mosta
Casa Arkati
Officially opened on 1st August 1993, Casa Arkati is situated in Mosta overlooking the evergreen Wied il-Għasel valley and offers unobstructed views of the historical city of Mdina. Those being cared for at Casa Arkati experience a comfortable stay, with spacious communal areas and a beautiful garden area.
Casa Arkati’s concept is based upon the philosophy of “Integrity, Quality and Care”. This ensures that the running of our Home is carried out according to the highest possible standards of care. All aspects of the design of each residential room have been considered so that whether our residents are with us for a long period or simply a short stay, they feel comfortable, secure, and happy.
In Progress
PlantPrefabSteel
Haileybury School campus
- Mtarfa
- 2026
2026
Mtarfa
Haileybury School campus
Vassallo Builders was entrusted with structural alteration works and external works as part of the development of the Haileybury School campus in Mtarfa, located within the former Royal Naval Hospital complex. The project involved carrying out structural interventions to adapt the existing historic buildings to their new educational use, together with external works to support access, functionality, and integration of the campus within its surroundings. Given the heritage context of the site, the works required careful planning, controlled execution, and close coordination to ensure structural integrity and sensitivity to the existing fabric. This project reflects Vassallo Builders’ experience in delivering complex structural and external works within heritage and institutional settings, supporting the transformation of significant historic sites into modern educational facilities.